Watertown Public Shade Tree Hearing
MICHAEL15.21 MICIELI15.21 -CITY15.21 OF15.21 WATERTOWN15.21 -15.21 So15.21 I'm15.46 going15.7 to,15.94 officially,16.66 call17.86 the18.02 street18.18 hearing,18.5 order19.38 here.19.77 So20.73 this20.89 street21.14 hearing21.38 is21.78 for22.1 the22.26 proposed22.49 removal22.98 of23.61 124.46 5-inch25.02 diameter25.26 breast25.9 height,26.14 Okame26.46 Cherry26.94 located27.34 at27.82 9628.06 Moore28.62 Street.28.94 The29.9 tree30.06 is30.38 being30.54 proposed30.86 for31.18 removal,31.42 for32.3 ADA32.62 compliance.33.1 The34.38 road34.54 reconstruction34.78 project35.42 is36.06 placing36.38 a36.94 crosswalk,37.18 where38.31 the38.48 tree38.72 is39.03 located,39.27 and40.4 the40.63 current40.8 tree,41.2 will42.16 not42.31 be42.63 able42.8 to43.11 remain44.07 to45.27 meet45.59 ADA46.07 compliance.46.55 At48.39 this48.63 point,49.35 I49.75 have49.91 received50.16 no50.63 written50.95 objections,51.35 nor52.81 is53.13 anyone53.53 present54.01 to54.97 object.55.13 So56.41 I56.73 am56.89 going57.13 to57.45 permit57.61 the58.01 removal58.17 of59.45 this59.53 tree.59.85 And60.33 just60.57 for60.81 the61.05 record,61.13 several62.57 trees62.81 will63.29 be63.53 planted,63.77 on64.81 Moore65.05 Street65.29 after66.65 the66.81 road67.05 reconstruction67.89 project.68.2 Alright.70.13 Thank71.48 you.71.72
Tuesday November 26, 2024